Wednesday, October 27, 2010

Career Stimulus Package Legit

nuclear waste: "Return to Sender"!

a Castor transport to Berlin: In Gorleben invited about 400 people 70 barrels of nuclear waste in a strikingly realistic Castor dummy - and sent them "return to sender" to Berlin. To start the final deliberations of the environment committee, we delivered the barrels there in front of the Bundestag. Hundreds of people accompanied the shipment.



Thursday's count: Anti-nuclear chain at the Bundestag! The coalition parties prevented a debate on the Atomic Energy Act, now checks the opposition legal action. And the crucial parliamentary vote on Thursday promises to be exciting: According to media reports, have already announced five members from the government camp, with longer maturities NPP to vote. Thursday 28 October 2010, 8:00 clock: "Anti-Atom-breakfast"; 8.30 Clock: Protest chain; 9.00 Clock: "Nuclear Alert". info: http://www.campact.de
Castor blockade 2010
preparing X-thousand times across another great non-violent sit-in on the road section before. We will be starting Sunday, 7 Nov. 2010, filled with thousands of nuclear and the road at Gorleben.






info: www.x- tausendmalquer.de

Notice of the Police Department Lüneburg!

general application of a spatial and temporal restriction of the right of assembly within a corridor for the Castor transport

is shown below within the transport corridor restricted the fundamental right to freedom of assembly: I. Staging public Outdoor assemblies and elevators (so-called spontaneous meetings) for the period from 06.11.2010, 00:00 clock until 16/11/2010, 24.00 Clock prohibited in the corridor shown in Section IV. II All public meetings in the open air and elevators are for the period from 11.07.2010, 00:00 clock until 11/16/2010, 24.00 Clock prohibited in the corridor shown in Section IV. III. The prohibitions of I and II shall enter invalid as soon as the Castor transport is fully retracted into the fenced area of the intermediate camp. Moreover, the regulatory agency will immediately spatially release certain sections, when no longer needed for transportation.
IV bans are limited to the following geographic areas:
a) The railroad Lüneburg - Dannenberg, including a range of 50 m on either side of railway tracks in the city of
Lüneburg, the three branches off the Dahl Burger and Bleckeder highway entrances to the station, includes the space between East and West Railway Station (Station Street), including the station area, 50 m on either side of the railway line from Lüneburg to Dannenberg, including all at level crossings and bridges throughout the trail and in Annexes 1 and 2 unspecified area around the fence of the transfer station Dannenberg. b) The transportation route Dannenberg - Gusborn - Gorleben, including an area 50 m on either side of the transport route, including 500 m in radius around the entrance of the intermediate camp.

c) The transport section Dannenberg - Quick Born - Langendorf - Gorleben, including the connecting roads of Quickborn, Kacheri after Gusborn and a range of 50 m on either side of the transport route, including 500 m in radius around the entrance of the intermediate camp. The sections are shown in Appendix 1 of this order in detail. The annexes are an integral part of this Order.

V. The immediate enforcement of the points I and II of this Order is placed.

VI.Diese is available from the public announcement the following day, where known.


Found on


http://rote-predigt.over-blog.com - Let's see who gets what of France ...

- Thank you.



map of the protest Chain:
http://bit.ly/protestkette




0 comments:

Post a Comment